City of Miami Beach
Demolition Permit Process

Fast, Accurate Permitting for Miami Beach Projects

Step-by-Step Permit Guide

1. Gather Required Documentation

We collect all required documents for submission, including:

  • Completed Permit Application (specifying demolition and plumbing scope)
  • Detailed Plumbing Plans
  • Site Plan
  • Contractor License Information
  • Asbestos Survey Report
  • Rodent Inspection Certificate
  • FPL Disconnect Letters
  • Tree Preservation Approval
2. Submit the Application

All permit applications and documents are submitted electronically through the Miami Beach online portal.

3. Plan Review Process

City reviewers assess submitted plans for compliance with building codes and local regulations. If corrections are needed, we handle revisions and resubmissions. Once approved, we are prompted to pay all applicable permit fees.

4. Permit Issuance

When all conditions are met, we receive approval and download stamped plans and permits directly from the portal.

5. Schedule Inspections

We coordinate all required inspections during and after demolition to ensure code compliance and safety.

Required Inspections Include

Underground Plumbing

Rough-In Plumbing

Final Plumbing

Pre-Demolition

Final Demolition

Why Miami Beach Clients Rely On Us

Permit requirements in Miami Beach can be complex, but we simplify the process from start to finish. We take care of the details so you can focus on the build.

We help you:

Avoid timeline disruptions

Meet city requirements

Move forward with confidence

Planning a Demolition
in Miami Beach?

We’ve got your permitting, planning, and demolition covered.