City of Miami Demolition Permit Process
The step-by-step-process and list of documentation needed.
Demolition Permit Process
1. Gather Required Documentation
Recent Site Survey: Prepared by a certified surveyor, not older than six months, and drawn to scale.
DERM Approval: Obtain approval from the Department of Environmental Resources Management. (Only for commercial or multiple-unit buildings)
Tree Boundary Survey: Tree Boundary Survey depicting all trees on-site, including those in the right of way.
FPL Disconnect Letter: A formal letter from Florida Power & Light confirming the disconnection of electrical services to the property.
TECO Demo Letter: A letter from TECO (Tampa Electric Company) confirming the safe disconnection and removal of gas services
2. Complete the Application
We will send you over a permit application to sign and submit the signed application electronically through the iBuild portal.
We will then receive an email from eplans@miamigov.com with instructions for document submission.
3. Pay Upfront Fees
We will pay an upfront fee that is required, based on the total size of the project, as per the City's ordinance. You will be billed upon a
Payment can be made immediately after submission or through the provided payment options.
4. Submit Plans and Documents
We will electronically submit all required plans and documents through ProjectDox portal as per the instructions received.
5. Await Application Acceptance and Review
The city will review the application and all submitted documentation.
We may be asked to respond to feedback or provide additional information/documentation.
6. Obtain Permit Approval
Once all reviews are complete and any issues, if any, have been addressed, we will receive approval.
Once approved, we must pay all remaining permit fees to pull and print permit cards.
Then download approved plans and documents.
8. Proceed with Demolition
With the permit in hand, we may begin demolition work.
9. Schedule Inspections
During and after demolition, we will schedule necessary inspections to ensure compliance.
We will ensure all required inspections are passed as per City guidelines.
List of Required Inspections
Public Works: Final Public Works
Zoning/CE: Final Zoning
Building: Final Building
Plumbing: Sewer/Water Disconnect
Plumbing: Final Plumbing
Plumbing: Septic Tank Abandonment
7. Add Plumbing Contractor
Once Demolition Permit is approved we may go ahead and add a plumbing contractor.
We will go into iBuild and add a plumbing qualifier through the portal.